Angel Place, Office Tower

Required a Sheetmetal finish to all fire rated Plant Room Ductwork sections below 2.2m height, in order to meet Contract / Consultant specification requirements for hardness.

 

Proposed, designed and installed a mechanically reinforced Hard-Coat system, incorporating our Vermitex ‘7’ cement based compound, applied to an LAF expanded metal construction installed to Vermiduct

Benefit:

A cost effective and timely alternative to Sheetmetal was offered.

Angel Place, Office Tower

Required an aesthetic and cost effective alternative to 3 sided exposure SPF ductwork within plant room fire corridor.

 

Proposed and installed our Trimesh® – Vermiduct Bulkhead system to underside of ductwork (1-sided => reduced surface area) providing an aesthetic, textured spray finish with radius turndown at masonry blockwork.

Benefit:

A cost effective solution alternative to fire rating a 3 sided ductwork arrangement

Angel Place, Recital Hall

Required a lightweight and cost effective alternative to a complex fire rated sheet metal car park exhaust plenum construction.

 

Proposed, designed and installed our Trimesh® – Vermiduct fire rated plenum to underside of concrete soffit.

Design: The Trimesh® construction was suspended from the slab above via fire engineered hanging rods & furring channel arrangements (doubling as fixing centres for suspended ceiling and essential services installation below by others). Plenum was fixed at masonry wall and slab via flexible joints (for improved vibration resistance). Trimesh® panels were sheetmetal backed to ensure airtight seal to exhaust air.

Benefit:

A cost effective, lightweight and air tight construction solution.



Westmead Hosiptal

Required the use of PVC for the Laboratories Fume Cabinets within the Hospital to avoid erosion from toxic gases and chemicals

 

LAF specifically researched and designed a 2-Hour system for the Fume Cabinets and relevant supports to the underside of the metal deck roof.

Benefit:

The system provided a cost-effective alternative to Stainless Steel.

GPO

During the Construction of the Substation Risers it was discovered that the Risers would not meet the specified requirements of the Sydney County Council on Fire Rating or the Cross Sectional area of the ductwork.

 

LAF proposed that the Risers be constructed out of Trimesh® that would provide a 3 hour FRL and accommodate the specified cross sectional area.

Benefit:

The System avoided the variation to masonry walls and extensive programme delays. It also proved to be far more economical than Sheetmetal construction.



MUA

Required a 2 Way Fire Rated Ceiling System. The original system had been engineered to incorporate Structural Steel Beams that would impose a heavy load onto the concrete platt seating

 

Proposed, designed and installed a lightweight 2 Way Fire Rated Plenum using our specifically designed Trimesh® System.

Benefit:

This system was to reduce the cost and time involved incorporating the additional steelwork and plasterboard construction.

 
 

 

Back to top

L & A Fazzini Pty Ltd - ABN 68 000 330 496
L & A Fazzini Manufacturing Pty Ltd - ABN 67 000 439 485

New South Wales Office
Address: 21-25 Wentworth Street Greenacre NSW Australia 2190
Postal Address: PO Box 13 Greenacre NSW Australia 2190
Contact Details: Tel 61 2 9642 4745, Fax 61 2 9742 5164
Freecall 1800 629 305 (for Australian Clients only)

Email:sales@lafgroup.com