Separating Construction
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Alltex®(
Interior & Exterior) |
Vermiduct®
(Interior) |
|
| Description: | Proprietary cementitious material | Proprietary plaster based material |
| Finish: | Monolithic, can be trowelled | Monolithic, can be trowelled |
| Colour: | Gray | Pastel pink |
| Packaging: | 50 Lt. bag | 50 Lt. bag |
| Coats: | One or more as required | One or more as required |
| Cure: | Hydraulic set | Hydraulic set |
| Initial Set: | 6 to 8 hours | 2 to 6 hours |
| Coating interval | Up to 8 hours | Up to 8 hours |
Tested Properties
Alltex® |
Vermiduct® |
|||
| Applicable standards & Assessments | AS 1530.4; BS 476 Part 20 to 22;
ASTM E119 |
|||
| Fire Resistance Level: | 1 to 4 hours inclusive |
|||
| Early Fire Hazard Properties of Materials | Ignitability |
Spread of Flame |
Heat Evolved |
Smoke Developed |
| to Vermiduct® AS 1530.3: | 0 |
0 |
0 |
0-1 |
| Specific Weight: | 960-1160 kg/m³ |
320 kg/m³ (± 10% at bagging) |
||
| pH: | 12 - 12.5 |
11 |
||
| Thermal Conductivity: | 0.127 W/m.K ± 10% |
|||
| Compressive Strength (MPa): | Ranges from 2.6 to 6.4 |
0.5 to 0.7 |
||
| Alltex® & Vermiduct® Estimated Bond Strength: | |
|||
| Black steel, Avg. Load (MPa) | < 0.14 |
0.08 |
||
| Primed steel (‘Galmet’ Coating), Avg. Load (MPa) | < 0.10 |
0.06 |
||
| Concrete, Avg. Load (MPa) | < 0.33 |
0.33 |
||
Trimesh® Construction System
The Trimesh® panels can be installed in both a horizontal
and vertical plane for the construction of walls, floors, ceilings and
plenum. The standard panel consists of two layers of mesh having a square
pattern of 6.3 cm. The layers of mesh are held apart at the required distance
by means of welded cross-wires positioned at 18º angles and alternately
rotated. The space frame is made of steel wire and can be supplied as
follows:
1) Plain three-dimensional wire frame panel for use in upgrading of walls
(one sided), to reinforce sprayed concrete and horizontal enclosures to
stairs and fire tunnels;
2) Variable Trimesh® thickness with a Polyurethane core (thickness
may vary) which serves as Thermal Insulation and backing surface for the
spray mortar to follow
3) With Aluminium Foil (Light, Medium & Heavy duty) adhered on one
side only, to provide a reflective thermal insulation and vapour barrier.
This non-erodable and smooth surface finish is ideal in plenum construction.
Note: Trimesh® panels must always be installed
in accordance with L & A Fazzini Manufacturing Pty Ltd's Construction
Standards. Deviations from these Standards should not be made without
previous written approval from LAF.
Services and Utilities installation
Where required these should be noted on the specifiers drawings
and should identify the required services and fixing methodology. Installation
of hydraulic and electrical utilities should be carried out by the relevant
contractor, before mortar spraying operations commence.
The Trimesh® Test incorporated services such as, PVC, Steel &
Copper Pipe Penetrations, Fire Dampers, Electrical Cable Trays and Air
Handling Ductwork. This provides a total solution package for all Passive
Fire Protection needs. The Tested assembly achieved from 2 hours up to
and including 4 hours Fire Resistance Level to AS 1530.4. (2)
Application Instructions
Once the fixing of the Trimesh® has been completed spray operations may commence. This operation is carried out by approved applicators making use of products supplied by LAF.
The products supplied by L & A Fazzini Manufacturing P/L, for exclusive
use with Trimesh® include:
Under normal conditions mortars do not require the use of additives, however
in some instances (wind, direct sunlight) precautions may have to be taken
to prevent "drying out" of the mortar during, as well as after
application.
First layer or ‘scratch coat’ shall be uniformly applied to
leave mesh exposed. Finish must be uniform and textured rough to provide
a good bond for subsequent coatings.
Position levelling ‘grounds or screeds’ ready for application
of the ‘second coat’ or ‘brown coat’. Once the
‘scratch coat’ has set and partially dried the ‘brown
coat’ application should proceed. The ‘brown coat’ shall
be left smooth or lightly roughened depending on whether a further finishing
coat is to be applied. Once the ‘brown coat’ has set and partially
cured apply the ‘finishing coat’.
Vermiduct® and Alltex® are mill-mixed compounds which can be sprayed
over the Trimesh® at the corresponding thickness stipulated by the
Manufacturer (refer Thickness Tables).
Once the mechanical reinforcement has been secured the whole thickness
can be sprayed in one coat, by experienced applicator Teams. Multiple
coatings will achieve a smooth and even textured finish, however a new
coating should only be applied over one that has partially set. Where
this is not possible the last coating surface should be left with a ‘deep
& rough texture’ or purposefully scratched. Depending on the
scope of work, our Applicators can offer a variety of Finishes to suit
the requirements. When ‘Trowelling’ or ‘Ruling’
is unavoidable the applicator should not ‘overwork’ or ‘polish’
the sprayed material.
Vermiduct® & Alltex® when applied in ventilated areas to a
thickness of 50 mm, will dry in 3-4 weeks. Both materials are prone to
frost damage and temperatures surrounding the areas being sprayed should
not be allowed to fall below 4°C for a week, after installation.
Vermiduct® & Alltex® can be painted however suitable sealers
and paints must be used (2).
Vermiduct® can only be used for interior applications. Although Trimesh®
is galvanised and Alltex® is resistant to water, it is advisable that
in exterior applications and wet areas, Alltex® be top coated with
a water-repellent membrane to provide additional protection to the trimmed
edges of the Trimesh® wire panel.
Vermiduct® as well as Alltex® should also be protected from chemicals,
which have an impact on cement or plaster.
Alltex® may react with Aluminium and Aluminium alloys and a suitable
primer is recommended.
Bond Coat, Primer Compatibility and Corrosion prevention
When applying Vermiduct® as well as Alltex®
no ‘Bond Coat’ is required, and primer compatibility issues
do not normally arise.
In certain applications,
Only stainless steel protective ‘Angle Corner Beads’ should
be used for exterior applications.
Vermiduct® as well as Alltex® may react
with Aluminium and Aluminium alloys and a suitable primer is recommended.
Coverage
One 50 litre bag of Vermiduct® or Alltex® will cover
approximately 1m² at a nominal thickness of 50 mm (without wastage
considerations).
Trimesh® Specification (Broad Form)
Before commencing the Vermiduct® or Alltex® application,
any structural supports as well as the Trimesh® substrate shall be inspected
by the Main Contractor to ensure all elements to be sprayed are securely
fixed and free from any substance which might impair proper adhesion of
the spray material.
All adjacent areas not requiring treatment shall be suitably protected
against droppings and overspray.
Mechanical reinforcement equal in all respects to LAF’s Trimesh®
shall be installed in accordance with the Manufacturers instructions and
any relevant Code and Standards.
..Vermiduct®.. or ..Alltex®.. ..(insert required material).. as
manufactured by L & A Fazzini Manufacturing Pty Ltd shall be installed
by an approved Specialist Contractor to the thickness of ..xx.. mm to
provide a Fire Resistance Level of ..xx.. mm to provide a Fire Resistance
Level of ..aaa / bbb / ccc ..(insert required thickness and FRL).. .
The Specialist Contractor shall provide all materials, accessories, spray
equipment, tools, inspection services and labour to satisfactorily carry
out the works in best trade practice. All workmanship and installation
techniques shall comply with the Manufacturers ‘Application Instructions’,
relevant Building Code Statutory requirements and applicable ASTM, BS
or AS Standards.
Refer to Test Data for more information
| Test Certificate No. | Vertical Trimesh® sprayed with | Thickness (mm) | FRL |
| 888 | Vermiduct® | 63 | 240/240/153 |
| 887 | Vermiduct® | 63 | 240/240/202 |
| 886 | Alltex® | 63 | 240/240/206 |
| 885 | Alltex® | 60 | 240/240/94 |
| Horizontal Trimesh® sprayed with | |||
| 883 | Vermiduct® | 62 | 240/240/169 |
| 884 | Vermiduct® | 60 | 240/240/240 |
| Horizontal Trimesh® (+ Dead Load of 35 kg/m²) sprayed with | |||
| 889 | Alltex® | 85 | 240/134/177 |
| Composite rectangular Trimesh® enclosure sprayed with | |||
| 890 | Vermiduct® | 40 | 240/205/151 |
Health Statement
Vermiduct® and Alltex® contain no asbestos and present
no known health hazard before, during or after application. Normal precautions
relevant to the handling of cement and plaster products apply: dust mask,
eye protection and covering of sensitive skin.
NOTES:
1. Refer to LAF for mesh requirement details or for other Vermitex®
applications
2. Refer to LAF for further detailed information
For more information or MSDS on Vermiduct® and Alltex® or any other products,
please see the technical data page, or contact: L & A Fazzini Manufacturing Pty Ltd
L & A Fazzini Pty Ltd - ABN
68 000 330 496
L & A Fazzini Manufacturing Pty Ltd - ABN 67 000 439 485
New South Wales Office
Address: 21-25 Wentworth Street Greenacre NSW Australia 2190
Postal Address: PO Box 13 Greenacre NSW Australia 2190
Contact Details: Tel 61 2 9642 4745, Fax 61 2 9742 5164
Freecall 1800 629 305 (for Australian Clients only)
Email:sales@lafgroup.com